Ceresdata Dual Active Storage System your location:Home > Product center > Storage System > Dual Active Storage >
Product introduction
Technical parameters
Download product information
Program characteristics  
  • Hardware architecture dual-machine dual-cabinet, application data double-write and live-active; dual-active function packaged inside the storage software system, deployed with the storage controller, no additional hardware equipment required。
  • Maintain double/multiple online data in real time, at least 4 cached data; when a storage system level failure occurs, multipath software automatically switches access to available storage data to ensure zero data loss.。
  • Supports a full range of storage products in the valley, and it is easy to achieve double-lived between different models of valley storage, achieving high cost performance。
  • No storage single point failure condition, automatic takeover after storage, realize seamless switching of faults, ensure continuous operation of business。
  • No performance worry, no hardware lock, no need to stop storage and operation。
     
Your benefit  
  • Designed to protect your core systems and ensure critical business operations continue. Since then, the operation and maintenance of peace of mind!
  • The design of the scheme avoids many known security risks in advance. 。
  • Ceresdata storage experts on-site research, based on past success stories and practices, optimize deployment process and ensure system online time。
  • Automatically identify and isolate faults when storage fails, business systems are not affected。
  • Support for dual-active data centers。

Service Content Combine valleys with past success stories and practices Set of Ceresdata Dual Active storage
stage Stage work content estimated time
Stage 1 Phase 1: Previous research and information gathering
  • Collect customer storage configuration information, business environment information
  • Design and discuss program details with customers
  •  Completion criteria:
    • Complete customer needs analysis of storage high availability environments
    • Complete the implementation plan and implementation plan and get customer confirmation 
  •  Service deliverables:
    • 《Ceresdata storage Dual Active implementation and test plan》
    • 《Ceresdata Storage and Living Implementation Plan》
3 business days
Stage 2 second stage:Prepare and implementValley number storage double activity program
  • Environmental preparation before hardware installation
  • Install and configure the valley storage hardware , customized tuning storage double live solution
  • Strictly tested according to the test plan
  •  Completion criteria:
    •   The implementation of the plan is completed and confirmed by the customer.
    •   Complete the test plan
  •  Service deliverables:
    •  《Valley number storage double live implementation report》
10 working days
(The working time of this part is related to the actual business scenario and data volume of the customer.)
Stage 3
  • The third phase:Customer confirmation and document submission
    •   Introduce the overall program implementation process to the customer
    •   Provide implementation documentation to customers
  •    Completion criteria:
    •   The customer received all project related information and documents
  •   Customer responsibilities:
    •  Sign the acceptance report
2个工作日